| 2019-08-18 |
Fabrication of steel support shaft and hubs for vertical access turbine
TED
CAN
|
D Copeland Engineering Ltd. |
Open Procedure |
€50k |
| 2019-03-16 |
Design, build, deploy and test a floating 60 Kw hydro-kinetic turbine platform that taps river flows to generate renewable electricity
TED
|
— |
Open Procedure |
— |
| 2018-08-17 |
Design and supply of a power take off converter and control system for a 60 kw hydro-kinetic turbine
TED
|
— |
Open Procedure |
— |
| 2018-06-19 |
Supply of 2 X Motor and gearbox sets for power generation from a 60kW Hydrokinetic Turbine
TED
|
— |
Open Procedure |
— |
| 2018-05-18 |
Design and fabrication of deployment structure to support marine-based testing of hydrokinetic turbine including means to deploy and extract test device
TED
|
— |
Open Procedure |
— |
| 2017-12-29 |
Supply of a test site and testing services to optimise and demonstrate performance of power generations from a hydrokinetic turbine
TED
|
— |
Open Procedure |
— |
| 2017-09-20 |
Design, specify and supply an AC to AC power take off and control system for 25kW Hydro-kinetic Turbine
TED
CAN
|
Mitsubishi Electric Ireland |
Open Procedure |
€41k |
| 2017-07-28 |
Computational Fluid Dynamic Modelling Services for Hydro-kinetic Turbine
TED
CAN
|
Numerics Warehouse Ltd. |
Open Procedure |
€138k |
| 2017-07-13 |
Testing and validation services in respect of power generation via hydrokinetic turbine
TED
CAN
|
SEENEOH |
Open Procedure |
€230k |