National Oil Reserves Agency

file no.2656 active2013-04-16 – 2025-05-13 suppliers7 spend areas9
Contracts
35
Total committed
€23.52M
Solo / framework
7 / 0
Period
2013-04-16 – 2025-05-13
year
procedure

Top suppliers

click to filter
  1. 01 Geoline Ltd 1
  2. 02 lcf marine 1
  3. 03 IPAT Ltd 1
  4. 04 Hugh Munro and Co. 1
  5. 05 Byrne Ó Cléirigh 1
  6. 06 Servco Integrated Solutions 1
  7. 07 Project Design Engineers Ltd 1

Spend areas

click to filter
  1. 01 Works for complete or part construction and civil engineering work. 2
  2. 02 Painting work. 2
  3. 03 Repair and maintenance services of tanks. 1
  4. 04 Technical inspection and testing services. 1
  5. 05 Application work of protective coatings. 1
  6. 06 Tunnel linings construction work. 1
  7. 07 IT services: consulting, software development, Internet and support. 1
  8. 08 Accounting services. 1
  9. 09 Internal audit services. 1

Contract listing

35 records
Date Contract Suppliers Procedure Awarded
2025-05-13 Nora 5 Yearly Inservice Tank Inspections in Poolbeg and Ringsend TED Open Procedure
2024-09-06 NORA Tarbert Out of Service Inspection TED Open Procedure
2024-09-06 NORA Tarbert Tank Lining of the Floor TED Open Procedure
2024-03-20 NORA Solar System Upgrade Project TED Open Procedure
2024-03-06 Ringsend Bund Lining Repair Project TED CAN Geoline Ltd Open Procedure €138k
2024-02-08 Jetty Repair Works TED CAN lcf marine Open Procedure €841k
2023-04-12 PFOS Foam Replacement Open Procedure
2023-03-15 Ringsend Diesel Engine Driven Generator Open Procedure
2022-11-15 Ringsend Tank 12 Coating Open Procedure
2022-10-03 Poolbeg Jetty Inspection Open Procedure
2022-04-28 Ringsend Product Export Pump Installation Works Open Procedure
2022-04-11 Non-Destructive Testing (NDT) Scope of Work for Tank 7 and 12 Open Procedure
2022-04-11 5 Yearly Tank Inspection Program Safety Respect for Natural Environment & 10 Yearly Piping Inspection Program Safety Respect for Natural Environment Open Procedure
2022-01-11 RFT for Scope of Supply & Work for Atex Database Systems & Inspections at NORA Oil Storage Terminals IPAT Ltd Open Procedure
2021-07-08 RFT for Detailed Design Engineering Phase Hugh Munro and Co. Open Procedure
2020-09-05 Contract for the administrative, technical and financial services for the Biofuels Obligation Scheme TED CAN Byrne Ó Cléirigh Open Procedure €1.55M
2020-06-08 Replacement of Electrical Cabling at the NORA Mainland Tankfarm, Tarbert, Co. Kerry Servco Integrated Solutions Open Procedure
2019-03-27 Operating and Maintenance Services at three oil storage terminals: (1) Tarbert, Co. Kerry, (2) Ringsend, Dublin Port (3) Poolbeg, Dublin Port TED CAN Open Procedure €5.54M
2019-01-04 Tank Painting of Oil Storage Tanks at Poolbeg Oil Storage Facility Open Procedure
2018-12-17 IT Managed Service Open Procedure
2018-07-24 Bund Upgrade at the NORA Mainland Tankfarm, Tarbert, Co. Kerry Open Procedure
2017-08-17 The provision of engineering & project management services to upgrade the bund at the NORA tank farm, Tarbert, Co. Kerry. Open Procedure
2017-04-27 Tank Painting at the NORA Ringsend Oil Storage Facility TED Open Procedure
2017-02-27 Provision of Financial Accounting Services TED Open Procedure
2016-05-20 Design & Build Contract for the refurbishment of the existing Poolbeg Oil Storage Facility TED CAN Open Procedure €13.50M
2016-03-07 Inspection of Oil Jetty and report generation TED Open Procedure
2015-10-16 Disinvestment and Tank Cleaning Works TED CAN Open Procedure €1.95M
2015-09-02 Provision of Financial Accounting Services RFT TED Open Procedure
2015-08-14 RFT for the Provision of Internal Audit Services 2016-2019 TED Open Procedure
2014-11-05 Contract for the administrative, technical and financial services for the Biofuels Obligation Scheme TED Open Procedure
2014-06-13 Engineering services Poolbeg Open Procedure
2014-05-16 Truck Loading Automation Systems Open Procedure
2014-04-04 M&E Works for NORA Truck Loading Automation Systems Open Procedure
2013-05-31 TRUCK LOADING AUTOMATION Project Design Engineers Ltd Open Procedure
2013-04-16 Painting of Four Oil Storage Tanks at Tarbert Open Procedure