| 2020-10-12 |
Widening corridors and linking corridors to main building
|
gerard quirke construction LTD |
Open Procedure |
— |
| 2018-06-19 |
Relocation of school entrance
|
— |
Open Procedure |
— |
| 2017-07-06 |
Replace the existing LPHW Heating System in the school, including removal of existing, connection of new gas mains and installation of new heating centre and heating system throughout the school.
|
Kamec Engineering Limited |
Open Procedure |
— |
| 2015-04-28 |
St. Anne's Secondary School: Replacement of Large Window
|
— |
Open Procedure |
— |
| 2014-08-18 |
Refurbishment and refitting of toilets and works to drainage
|
— |
Open Procedure |
— |