No record · capture-style frame does not apply No matches in the lobbying register for this supplier name. Substring match on lobbyist name and clients-text, with corporate-suffix stripping.
Sole-awardee contracts. Awarded values reflect actual money paid to this supplier.
| Date | Authority | Contract | Procedure | Estimated | Awarded |
|---|---|---|---|---|---|
| 2025-08-08 | Donegal County Council | Donegal County Council - Consultancy Services for the Design and Supervsion of a Replacement Bridge and the Design of Appropriate Containment Structures on a number of Existing Masonary Arch Bridges CAN | Open Procedure | — | €27k |
| 2025-04-01 | Fingal County Council | FCC/185/25 Engineering Design Services for Rathmore park recreational Hub, Lusk for Fingal County Council CAN | Open Procedure | €0 | €81k |
| 2025-02-20 | Mayo County Council | MCC Conservation of Belmullet [Knight] Pier | Open Procedure | €9k | €14k |
| 2025-02-07 | Cavan County Council | TEN2500015 - Tender for Canningstown Bridge Widening and Junction Improvement Scheme- Consulting Engineering Services for Cavan County Council | Open Procedure | €150k | €149k |
| 2025-01-27 | Monaghan County Council | Monaghan County Council wishes to tender for the provision of Design and Consultancy Services for Drum Circular Walkway at Drum, Co Monaghan. | Open Procedure | €56k | €53k |
| 2024-11-22 | Westmeath County Council | TENDER FOR ESTABLISHMENT OF A FRAMEWORK PANEL TO UNDERTAKE CIVIL AND STRUCTURAL ENGINEERING CONSULTANCY SERVICES. TED | Open Procedure | — | €10.00M |
| 2024-09-17 | South Dublin County Council | CFT 3681 - Establishment of a Multi-Party framework agreement for Conservation Consultancy Services including Conservation Engineer and PSDP | Open Procedure | — | €220k |
| 2024-08-19 | Fáilte Ireland-National Tourism Development Authority | AC/2024/06 Route Identification for an All-Ability Trail between Laragh and Glendalough | Open Procedure | €185k | €200k |
| 2024-06-13 | Donegal County Council | Donegal Co. Co. Engineering Consultancy Services for Design of Suitable Repair of Dernafanogy Bridge TED CAN | Open Procedure | — | €40k |
| 2024-05-20 | Mayo County Council | MCC Consultancy services. Route investigation and preliminary design , Louisburgh to Carrowmore beach, Co.Mayo. | Open Procedure | €40k | €40k |
| 2024-05-16 | Donegal County Council | Donegal County Council - Procurement of Consultancy Services for Fintra to Largy Coastal Walk Project Development CAN | Open Procedure | — | €41k |
| 2024-03-19 | Department of Agriculture Food and the Marine | Professional Consultancy Services for the Implementation of Building Information Modelling (BIM) in the Marine Engineering Division | Open Procedure | €38k | €36k |
| 2024-03-06 | Meath County Council | Meath Co Co MH-ENV-24-01 Integrated Civil Engineering Led Design Team Services for the Stamullen Burial Ground Project TED CAN | Open Procedure | €250k | €220k |
| 2023-08-29 | Mayo County Council | MCC PSDP and Design Service – Greenway Ancillary Infrastructure: Ch 500m Trailhead, Achill Sound, Co. Mayo. | Open Procedure | €5k | €17k |
| 2021-09-14 | Monaghan County Council | Consultancy Services for footpath and pedestrian crossing design | Open Procedure | — | — |
| 2020-09-14 | Monaghan County Council | Consultancy Services for Monaghan County Council Regional & Local Roads Bridge Rehabilitation Works 2021 | Open Procedure | — | €93k |
| 2019-10-10 | Donegal County Council | The design of the refurbishment works of storm damaged structures in Swan Park, Buncrana | Open Procedure | — | — |
| 2018-01-12 | Fingal County Council | Engineering & Environmental Consultancy Services for Howth Loop Paths Project | Open Procedure | — | — |
| 2016-09-16 | Westmeath County Council | Westmeath County Council seeks tenders for Consultancy Service for the design of a Pedestrian and Cycleway Bridge at Saunders Bridge Mullingar. | Open Procedure | — | — |
Multi-supplier frameworks. Awarded values shown are framework ceilings split across all listed co-suppliers — not per-supplier earnings. Use the count, not the money.
| Date | Authority | Contract | Procedure | Estimated | Ceiling |
|---|---|---|---|---|---|
| 2024-10-01 | Trinity College Dublin the University of Dublin | Multi-Party Framework Agreement for the Provision of Civil and Structural Engineering Services for Trinity College Dublin, the University of Dublin framework · 8 suppliers TED CAN | Open Procedure | €4.00M | €4.00M |
| 2024-03-04 | Meath County Council | Meath Co Co MH-TRA-24-03 Bridge Rehabilitation Consultancy Services framework · 8 suppliers TED CAN | Open Procedure | €750k | €2.00M |
| 2022-07-28 | National Transport Authority | Framework Agreement for the provision of Consultancy Services for design, construction management and other services for Transport Projects of Estimated Value Less Than €3million funded by the Na framework · 21 suppliers TED CAN | Open Procedure | €50.00M | €50.00M |