No record · capture-style frame does not apply No matches in the lobbying register for this supplier name. Substring match on lobbyist name and clients-text, with corporate-suffix stripping.
Sole-awardee contracts. Awarded values reflect actual money paid to this supplier.
| Date | Authority | Contract | Procedure | Estimated | Awarded |
|---|---|---|---|---|---|
| 2025-06-24 | Kerry County Council | Upgrade of Mooring System at Knightstown Breakwater | Open Procedure | €370k | €311k |
| 2025-03-05 | Sligo County Council | SCC2025-0016 To design manufacture install and commission a seasonal pontoon access gangway and access platform at Enniscrone Pier County Sligo as per Works Requirements. CAN | Open Procedure | €130k | €130k |
| 2025-02-12 | Kerry County Council | Maintenance for Floating Breakwater in Knightstown | Open Procedure | €170k | €311k |
| 2024-06-25 | Shannon Leisure Development Company LTD t/a Carrick Craft | Marine Development Works at Carrickcraft, St George’s Terrace, The Marina, Co Leitrim | Open Procedure | — | €410k |
| 2023-04-05 | Mayo County Council | Design, Fabrication and Installation of a Seasonal Pontoon at Dugort Pier Achill | Open Procedure | — | — |
| 2023-03-23 | Mayo County Council | MCC - Design Fabrication and Installation of a Floating Mooring | Open Procedure | — | — |
| 2022-10-29 | Waterways Ireland | Supply of Floating Mooring Units TED CAN | Open Procedure | €200k | €192k |
| 2022-09-30 | Waterways Ireland | Shannon Erne Lock 16 Design and Supply of New Fixed Walkway | Open Procedure | — | — |
| 2022-08-19 | Kerry County Council | Replacement of 100 no. Connectors at Knightstown Breakwater, Valentia Island | Open Procedure | — | — |
| 2022-05-19 | Department of Agriculture Food and the Marine | Pontoon Works - New East Basin Passenger Pontoon at An Daingean Fishery Harbour Centre, Co. Kerry | Open Procedure | — | — |
| 2022-03-04 | Kerry County Council | Maintenance of Floating Breakwater at Knightstown | Open Procedure | — | — |
| 2021-10-26 | Waterways Ireland | Shannon Jetties 2021 | Open Procedure | — | — |
| 2021-07-08 | Ramor Watersports Club | Extend existing floating marina and all associated site works | Open Procedure | — | — |
| 2020-05-30 | Waterways Ireland | Floating Breakwater & Mooring Shannon Navigation 2020 TED CAN | Open Procedure | — | €221k |
| 2020-02-28 | Coiste Forbartha na Sceilge | Supply and Install of Pontoon at Reen Pier, Ballinskelligs, Co. Kery | Open Procedure | — | — |
| 2020-02-21 | Sligo County Council | Erection of 2no. Floating Angling Stands (including 1 no. Disabled Access Fishing Stand on the Garavogue River at Doorly Park,Sligo. | Open Procedure | — | — |
| 2019-12-12 | Kerry County Council | Maintenance of Floating Breakwater in Knightstown, Co. Kerry | Open Procedure | — | — |
| 2019-07-12 | Wexford County Council | Kilmore Quay and New Ross Marinas Refurbishment Works. | Open Procedure | — | — |
| 2019-05-01 | Department of Agriculture Food and the Marine | Passenger Pontoons Fenders Replacement Works at An Daingean FHC | Open Procedure | — | — |
| 2017-12-07 | Waterways Ireland | Tender for Floating Mooring Units for Sites on the Erne Navigation TED CAN | Open Procedure | €220k | €264k |
| 2017-08-28 | Department of Agriculture Food and the Marine | Pontoon System Works for East Basin Pontoons Refurbishment and Extension at An Daingean Fishery Harbour Centre, Co. Kerry | Open Procedure | — | — |
| 2017-08-24 | Waterways Ireland | Tender for Floating Mooring Units for the Shannon & Erne Navigations TED CAN | Open Procedure | €300k | €298k |
| 2017-01-20 | Department of Agriculture Food and the Marine | Rossaveel Small Craft Harbour Pontoon fit out | Open Procedure | — | — |
| 2016-09-28 | Department of Agriculture Food and the Marine | New West Pier Pontoon and Gangway at Howth Fishery Harbour Centre, Co. Dublin | Open Procedure | — | — |
| 2016-09-27 | Waterways Ireland | Abbey River Boat Arrest System | Open Procedure | — | — |
| 2016-08-17 | Waterways Ireland | Floating Walkway/Mooring Units Acres Lake | Open Procedure | — | — |
| 2016-07-15 | Department of Agriculture Food and the Marine | Pontoon System at North Harbour, Cape Clear Island, Co. Cork | Open Procedure | — | — |
| 2015-09-29 | Department of Agriculture Food and the Marine | Pontoon System at Dunmore East Fishery Harbour Centre, Co. Waterford | Open Procedure | — | — |
| 2015-09-01 | Department of Agriculture Food and the Marine | Killybegs Small Craft Harbour - Phase 2 | Open Procedure | — | — |
| 2015-07-29 | Department of Agriculture Food and the Marine | New Pontoons and Gangway Works at Howth Fishery Harbour Centre, Co. Dublin | Open Procedure | — | — |
Multi-supplier frameworks. Awarded values shown are framework ceilings split across all listed co-suppliers — not per-supplier earnings. Use the count, not the money.
| Date | Authority | Contract | Procedure | Estimated | Ceiling |
|---|---|---|---|---|---|
| 2023-06-08 | Mayo County Council | The Design Fabrication and Instalation of a Seasonal Pontoon at killalla Pier (1) framework · 2 suppliers | Open Procedure | — | — |
| 2022-10-19 | Inland Fisheries Ireland | Supply and Delivery of Glass Reinforced Plastic (GRP) Products framework · 3 suppliers TED CAN | Open Procedure | €420k | €87k |