No record · capture-style frame does not apply No matches in the lobbying register for this supplier name. Substring match on lobbyist name and clients-text, with corporate-suffix stripping.
Sole-awardee contracts. Awarded values reflect actual money paid to this supplier.
| Date | Authority | Contract | Procedure | Estimated | Awarded |
|---|---|---|---|---|---|
| 2025-08-01 | Department of Agriculture Food and the Marine | Howth FHC East Pier Upgrade Surfacing and Drainage Works Lot 1 and 2 | Open Procedure | €400k | €788k |
| 2024-08-30 | Department of Agriculture Food and the Marine | Howth FHC Middle Pier Upgrade Surfacing and Drainage Works 2024 TED CAN | Open Procedure | €400k | €387k |
| 2022-06-10 | Department of Agriculture Food and the Marine | CONSTRUCTION OF BOAT SHED AT EAST PIER, HOWTH FHC - DUBLIN –RC Rebuilding of existing boatshed on East Pier that was previously destroyed by storm and carry out roof sealing and repairs | Open Procedure | — | — |
| 2022-03-29 | Department of Agriculture Food and the Marine | Boatyard concrete slabs and drainage works 2022 Howth FHC | Open Procedure | — | — |
| 2021-09-27 | Department of Agriculture Food and the Marine | Arsenal Building Reroofing Upgrade & Repairs - West Pier, Howth Fishery Harbour Centre | Open Procedure | — | — |
| 2021-05-19 | Department of Agriculture Food and the Marine | Upgrade of up to 2 no. existing boatyard work bays in Howth FHC with new drainage and concrete surface | Open Procedure | — | — |
No multi-supplier framework participations on record.