No record · capture-style frame does not apply No matches in the lobbying register for this supplier name. Substring match on lobbyist name and clients-text, with corporate-suffix stripping.
No sole-awardee contracts on record.
Multi-supplier frameworks. Awarded values shown are framework ceilings split across all listed co-suppliers — not per-supplier earnings. Use the count, not the money.
| Date | Authority | Contract | Procedure | Estimated | Ceiling |
|---|---|---|---|---|---|
| 2023-10-14 | SIGA HYDRO LIMITED | Engineering Design, and applications for PCI development consent and grid connection (T2.2) for EU Project of Common Interest (PCI) 2.29 Hydroelectric Power Station, Silvermines (IE), Tipperary framework · 3 suppliers CAN | Open Procedure | €2.50M | €1.63M |
| 2021-02-05 | EirGrid plc | Vision 2030 Partner Framework framework · 14 suppliers TED CAN | Competitive Procedure With Negotiation | €45.50M | €45.50M |