| Date | Contract | Suppliers | Procedure | Awarded |
|---|---|---|---|---|
| 2024-04-29 | WCCC24 262 St. Saviour's National School, Ballybeg, Waterford - Safe Routes to School Scheme | Power Transformative Engineering Ltd | Open Procedure | €240k |
| 2023-03-21 | Passage East Slipway and Pier Repairs 2023 | framework · 4 Donnelly Civil Engineering Ltd, MJS Civil Engineering Ltd, Power Transformative Engineering Ltd +1 |
Open Procedure | — |
| 2022-07-01 | WCCC 22/375 Boatstrand Harbour Refurbishment Work | Power Transformative Engineering Ltd | Open Procedure | — |
| 2022-06-20 | Improvement works to Tramore Pier involving structural strengthening to base and face of concrete structure and new ladders and steps and overslabbing on a proportion of existing pier slab | Power Transformative Engineering Ltd | Open Procedure | — |
| 2022-02-18 | Concrete Footpaths and Road Resurfacing - Waterford City | Power Transformative Engineering Ltd | Open Procedure | — |
| 2021-07-28 | WCCC 21/386 Cheekpoint Pier Repairs Contract | Power Transformative Engineering Ltd | Open Procedure | — |
| 2020-09-22 | Mens slip storm wall retaining wall repairs, Tramore, Co. Waterford. | Power Transformative Engineering Ltd | Open Procedure | — |