| 2025-08-01 |
Howth FHC East Pier Upgrade Surfacing and Drainage Works Lot 1 and 2
|
OMCC Joinery Limited |
Open Procedure |
€788k |
| 2024-08-30 |
Howth FHC Middle Pier Upgrade Surfacing and Drainage Works 2024
TED
CAN
|
OMCC Joinery Limited |
Open Procedure |
€387k |
| 2022-06-10 |
CONSTRUCTION OF BOAT SHED AT EAST PIER, HOWTH FHC - DUBLIN –RC Rebuilding of existing boatshed on East Pier that was previously destroyed by storm and carry out roof sealing and repairs
|
OMCC Joinery Limited |
Open Procedure |
— |
| 2022-03-29 |
Boatyard concrete slabs and drainage works 2022 Howth FHC
|
OMCC Joinery Limited |
Open Procedure |
— |
| 2021-09-27 |
Arsenal Building Reroofing Upgrade & Repairs - West Pier, Howth Fishery Harbour Centre
|
OMCC Joinery Limited |
Open Procedure |
— |
| 2021-05-19 |
Upgrade of up to 2 no. existing boatyard work bays in Howth FHC with new drainage and concrete surface
|
OMCC Joinery Limited |
Open Procedure |
— |